PROYAPI A.Ş. ProYapi Mühendislik Müşavirlik Çerez Politikası 



PROJECT DETAILS

Country:
Turkey
Location Within Country:
Giresun
Name of Client:
Akköy Energy Co. Inc
Start date (month/year):
08.2008
End Date (month/year):
09.2012
Kaynak:
National Fund

PROJECT NAME:

Akköy II Dam & HEPP



TYPE OF SERVICE:

Design and Engineering Services



OTHER DETAILS:

Akköy II Dam and HEPP Project Consultancy Services In the scope of the Project all the technical specifications, final and detail design projects were reviewed and advised accordingly. Besides all the design works including the access roads, procurement works, installation and operation of the plants is monitored and consultancy services is given for electrical, hydro-mechanical and all engineering works. Akköy Dam and HEPP is in the North part of Turkey, approximately 55 km far away from the Black Sea and in between the border of Gümüşhane and Giresun. Akköy II Project is consisting of Aladereçam Dam on Karacık River, Gökçebel Dam on Gelebele River and Yaşmaklı Dam on Gavraz river, transmission lines between the rivers, 1240 m penstock pipe and installed Akköy II HEPP on Harşit river. Akköy II HEPP will generate 900 GWh electric annually. In the scope of the Akköy II HEPP, following plants are located. -Aladereçam Dam on Karaovacık river. -Gökçebel Dam on Yaşmaklı Dam -4627 m transmission line in between Aladereçam reservoir and Gökçebel reservoir. -6713 m transmission line in between Yaşmaklı reservoir and Gökçebel reservoir. -4033 m energy tunnel on Yaşmaklı reservoir -7 MW capacity HEPP Aand penstock on Gökçebel. -234 MW capacity Akköy II HEPP on Harşit River and 3958 m penstock.